UNC EHS Training
UNC EHS Training
 
 
 

How to Conduct a JSA: Document the Work Tasks, con't.

Document the Work Task to be completed; in the Task column, write down each step (or task) required to complete the job. Consider preparation and clean-up, and be as thorough as possible. Number the steps sequentially.